DIONE Wallet — homeDIONE Wallet
Feature

EVM Wallet for Odyssey Chain — EVM Compatible Self-Custody

DIONE Wallet is a self-custody EVM wallet built for Odyssey Chain by default and ready for the wider family of EVM compatible chains and EVM based blockchains — Ethereum, Polygon, Arbitrum, Base, BNB Smart Chain and more via custom RPC. New to the space? Read what is an EVM wallet for the basics, or see the full chain list in DIONE Wallet multi-chain support.

What EVM-compatible means

The Ethereum Virtual Machine (EVM) is the runtime that executes smart-contract bytecode on Ethereum and on every chain that implements it. EVM compatibility means the same address format, the same transaction signing scheme (ECDSA over secp256k1), the same gas accounting, and the same JSON-RPC interface. A wallet that speaks EVM speaks all of them at once.

Odyssey Chain implements the EVM via Coreth (the Avalanche-derived EVM execution layer). Your DIONE address is a standard 0x-prefixed Ethereum address. The same private key controls the same address on Ethereum mainnet, Polygon, Arbitrum, Base, and any of the other evm compatible blockchains — but the balance on each chain is separate.

DIONE Wallet ships Odyssey Chain as the native default so DIONE holders don't have to configure custom RPC, manage chain IDs, or click through caution dialogs. The rest of the evm compatible chains are one custom-RPC entry away, and the whole experience stays evm compatible self-custody — your keys never leave your device.

EVM-compatible DIONE Wallet — send crypto screen with asset selector, recipient address, amount and network fee tiers

Supported chains

Odyssey is native. Add the rest with one custom-RPC entry each — get current RPC URLs from each chain's official docs or chainlist.org, never from a third-party page.

Odyssey Chain

native
ID
153153
Currency
DIONE
Native — no RPC setup needed

Why DIONE Wallet for EVM

Odyssey-native by default. No custom RPC entry, no chain-ID lookup, no "this network may be a scam" modal on every transaction.

In-wallet staking. Validator delegation lives inside the app. MetaMask routes you to a separate staking dashboard via WalletConnect.

Standard EVM elsewhere. Add any EVM chain via custom RPC. Your seed phrase is BIP-39 portable — you're not locked in.

Coming from another wallet? See DIONE Wallet vs MetaMask comparison, explore native DIONE staking, or read how to add Odyssey Chain to MetaMask. Ready to install? Get the DIONE Wallet desktop download.

EVM compatibility FAQ

Is DIONE Wallet EVM-compatible?

Yes. DIONE Wallet implements the full Ethereum Virtual Machine standard. Odyssey Chain is the native default, and you can add Ethereum, Polygon, Arbitrum, Base, BNB Smart Chain, Optimism, and Avalanche via custom RPC entries.

Do I need custom RPC for DIONE coin?

No. Odyssey Chain (chain ID 153153) is the native default in DIONE Wallet. You only need custom RPC for non-Odyssey EVM chains.

Can I use my MetaMask seed phrase in DIONE Wallet?

Yes. DIONE Wallet uses the BIP-39 standard, so any 12 or 24-word seed phrase generated by MetaMask, Rabby, or any compliant wallet can be imported. Your address space is identical across EVM chains.

Which EVM standards does DIONE Wallet support?

EIP-155 (chain ID), EIP-1559 (fee market), EIP-191 / EIP-712 (typed-data signing), and the standard JSON-RPC interface. WalletConnect v2 is supported for dApp connections.

Are gas fees the same across EVM chains?

Each EVM chain has its own native gas token and fee market. On Odyssey Chain you pay gas in DIONE; on Ethereum you pay in ETH; on Polygon in MATIC, and so on.

Does DIONE Wallet support ERC-20 tokens on Odyssey Chain?

Yes. Odyssey Chain implements the ERC-20 token standard. DIONE Wallet auto-detects common tokens and lets you add custom tokens by contract address.

Use DIONE Wallet for EVM

Native Odyssey Chain support, plus every EVM chain you already use. Free, self-custody, Hacken-audited.

Download DIONE Wallet

Free · Self-custody · Hacken-audited